We look forward to receiving your enquiry

Personal details

Which topic can we help you with?

0 / 350 Characters

* Please fill the required fields

This website is protected by reCAPTCHA. Google's Privacy policy and Terms of use apply.

Optimising production

Tips for process optimisation in injection moulding

Why is optimisation of the injection moulding process recommended? A comprehensive and critical evaluation of the process and the production conditions, allows you to define an efficient production flow for more stability and performance.

May 5, 2021
Reading time 6 minutes
Picture shows a part quality check by an ENGEL application engineer
Author
Andreas Pöttler
Andreas Pöttler
Service
Tag
  • consultancy
  • service & support
  • cost effectiveness

By observing a few points, you can achieve a stable and high performance in the production process. We support you with our tips for process optimisation in injection moulding:

1. Stable processes due to the elimination of melt cushion fluctuation

Weight fluctuations in the melt cushion between the plasticising screw and the mould, can endanger stable processes in the production sequence. Possible weight fluctuations and the overall process can be monitored by controlling the melt cushion. Unsuitable process settings – such as an insufficient holding pressure level or time – or wear on the plasticising screw are the most frequent causes of melt cushion fluctuations.

This is how you can resolve melt cushion fluctuation:

  • Decompression after plasticising should be set to between 2 and 15% of the screw diameter, depending on the type of non-return valve.

  • Check the non-return valve, screw and plasticising barrel for possible signs of wear.

  • Check the closing behaviour of the non-return valve; the closing behaviour can be improved by adjusting the decompression after plasticising.

  • Melt cushion fluctuation can be eliminated by using a plasticising unit that exactly matches the material.

  • If you notice feeding problems during plasticising, the barrel heating temperature must be adjusted to avoid bridging during material intake.

The customer is performing a quality check of the component and investigating optimisation opportunities.
Picture shows the Head of Application Services at ENGEL

What makes identifying the causes of problems difficult, is the wide variety of potential influencing factors. In this blog post, I am sharing with you some of my top tips for process optimisation in injection moulding that have secured the greatest success in my 20 years as an application engineer.

Andreas Pöttler, Head of Application Services at ENGEL Austria

2. Optimised quality thanks to complete moulded part filling

This section contains tips for process optimisation in injection moulding that relate to the optimisation of incompletely filled parts. This refers to injection moulded parts whose outer contours are not completely formed. Incompletely filled parts are injection moulded parts whose outer contours are not completely formed. This issue occurs particularly frequently with long flow paths or in thin-walled areas (for example ribs). If mould venting is inadequate, the problem can also occur at other locations.

  • Check that the injected plastic volume (for example, the shot volume) is not too low in relation to the parts weight.

  • Make sure that the injection pressure and injection speed of the injection moulding machine are sufficient and that there is a residual melt cushion.

  • The use of digital solutions from the ENGEL iQ product family makes it possible to increase part repeatability and compensate for various process fluctuations.

3. Short cycle times for improved productivity and cost efficiency

The primary goal of our customers is always to strive for low cycle times. To do so, we recommend regularly checking whether it is necessary to set maximum values for process stability. This is because maximum settings mean a correspondingly higher use of energy and place a greater load on the wear parts. Maximum values are always useful if the cycle time can be significantly reduced as a result.

Optimised cycle time thanks to parallel motion for efficient production.

With these tips for process optimisation in injection moulding, you can produce more efficiently and save costs:

  • Work with parallel motion to shorten the cycle time – simultaneous or synchronised movements save time: for example, you can start the peripheral solutions while the mould is still opening.

  • Check the mould opening strokes and set mould opening to the required minimum.

  • Use the entire cooling time for the plasticising process to ensure gentle processing of the material and minimise wear.

  • Reduce the screw speed during melt preparation – the energy requirements and material stress are also greater at higher speeds.

Do you need more support from our application engineering experts to optimise your injection moulding processes?

Related articles

ENGEL Team

Sales

Write to us

The ENGEL team will be happy to assist you with comprehensive know-how on the subject of injection moulding.

Your browser is out of date.

Internet Explorer is no longer supported. Please switch to a current browser to be able to use engelglobal.com to its full extent.

Your browser is out of date.

Internet Explorer is no longer supported. Please switch to a current browser to be able to use engelglobal.com to its full extent.